Case Study -- Camass

 


 

  • Sony, Taiwan
    New branch office building -- 10 cm (4.0") height.
  • OFTA project in H.K.
    Upgrading at telecommunication Bureau 6 cm (2.36") height Camass cover the old floor ducts.

 

 

 


 

BACK

 

 Copyright Netfloor, Inc.  All Rights Reserved.